The Town of Wrightsville Beach identified the need to rehabilitate the lift station located on Live Oak Drive. Lift Station #4 is an old brick and mortar with a 10-foot diameter wet well.

SEPI was selected by the Town to design and manage the rehabilitation of the station. The project scope includes the construction of a new 8-foot diameter wet well inside the existing wet well, replacement of the pumps and controls, and upgrade of the existing electrical service.

The project will require the partial demolition of the existing structure and removal of existing pumps and controls. This will require bypass pumping to be provided by the contractor to maintain operational integrity of the site while improvements are made.

SEPI is providing survey, engineering design, permitting, and bid and construction management services.