The Lake Dam Road Bridge project consists of a 4,611-SF bridge replacement over Walnut Creek. The bridge will re-connect the divided segment of Lake Dam Road for through traffic between Avent Ferry Road and Tryon Road.

The new two-lane bridge will provide bike lanes and improvements to the existing accessibility for the adjacent Capital Area Greenway and Lake Johnson Park. Project construction will also include new pedestrian signage, markings, curb and gutter, and best management practices related to stormwater regulations.

SEPI is providing construction administration and inspections for roadway, structures, erosion control, materials sampling, surveying grade verification, documentation of pay quantities, and claims avoidance for Federal-funding reimbursement for the City.